Fast vs. Slow
examples of physical progress happening fast vs. slow.
Buildings
- The Empire State Building. Built 1930-31 (410 days). 102 stories. 90 years latter is still an icon. Cost $40M ($560M in 2022).
- The One (Toronto). Started Nov 2017. Estimated completion 2024. 94 Stories. 7 Years to build (estimated), total cost of $1.5 Billion.
- India’s New Parliament. Built in 2.5 years for less than $125M.
Bridges
- The Gold Gate Bridge . Built 1933-37 (4 yrs) = $530M in 2022 $'s. 1.4 km, saves 10 M's of ppl hours.
- The Confederation Bridge. 1993 -98 (4 yrs) = $1.9B . 13km, saves 100K's off ppl hrs.
- The Champlain Bridge. 2015-19 (4 yrs) = $4.2B. 3.4 km, saves 10's M of ppl hours.
Highways
Example
- The Alaska Highway. Built 1942. 2,700 kms roadway were built over the course of 234 days ( < 1 year), connecting eastern British Columbia with Fairbanks, Alaska. Cost $135M = $2.2B Today.
- In 2022 fixing (not building) 200kms of the Trans-CanHwy will take years, and cost $1B+
Example
- Trans Canada HW1 (7500 kms of road) coast to coast. Built in 10 years (1950-1960) for $1B (Todays $).
- 4 Lane'ing highway 69 from Toronto to Sudbury (350 km). Started 1990 - ongoing (30 yrs). Cost $1B + plus.
Public Transit
Example
- Yonge St Line 1 Subway. Construction 1949 - 1954. $67M cost ($820M Today)
- Ellington LRT. Construction started 2011 - still going (12 years). Current cost = $11.5 Billion and counting.
Example
- The New York Subway. Started 02/21/1900. 28 stations openedon 10/271904, 4.7 years later. In April 2000, the MTA decided to build the Second Avenue Subway. The first phase, with 3 stations, opened on January 1 2017.
Example
Buildings
Example
- The CN Tower. Built from Feb 6 1973 - June 26, 1973 (3.5 years) Cost $63M = $421M now. Worlds largest structure. Massive impact to Canadians.
- It now takes us 5+ years to build a mid-rise building for north of $500M. We have better machines, labour, tools, and tech.
Example
- The Pentagon. The worlds largest office building. Decision on Thursday. Drawings un Sunday. Construction started 2 months later. Sept 1941 - Jan 1943. 491 days. Cost $83M or $1.2 Billion Today.
- Apple Park. Conceived 2006. Construction started 2013. Opened 2017. 4 Years and $5 Billion cost. The worlds largest & richest company.
Example
- The Eiffel Tower . Completed 1889 (133 yrs ago). Build time 2 yrs, 2 mo. Cost $45m in 2023. Was worlds tallest building for 40 yrs. 100m + / yr travel to visit it.
Mega Projects
- 1860, in 5 days !! 6 engineers, with 600 workers and 6k jacks, raised 1 acre of buildings (The Row on Lake Street, Chicago) 1.5M in elevation. 35K Tonnes. Best part ppl were still shopping.
Example
- Oconee Nuclear Power Plant. Built 1967-73 (6 Years). Cost $91M. $2.4B in 2022. At a cost of $181 / kW. Still running 50 yrs generating 22,206 GWh annually.
Ships
- The USS Nautilus. The worlds first nuclear submarine. Started July 1951, in service 1954. 1,173 days later. Cost $58.2M or $680M in 2022.
- The USS Gerald Ford. Started August 2005. Completed 22 July 2017. 12 years. Cost $18 Billion.
Software
Example
- JavaScript. Brendan Eich implemented the first prototype for JavaScript in 10 days, in May 1995. It shipped in beta in September of that year. Powers 98% of Websites on the internet.
- Arrive Can App. An app, should have been built in a weekend. Cost $50M. Used for 1.5 years and hated. Thrown away.
Example
- Git. Linus Torvalds started 4/3/05. Self-hosting in 4 days. 17 days later released. 100m+ devs us it. Largest source code host in the world.
- eHealth Ontario. Started 2002. Cancelled 2009. 7yrs. Cost $8B. 2016 Auditor General determined nothing of value was ever delivered.